photos 20230310. In this case, using the revolving doors will not conserve energy. Image March 11, 2023 Vik
photos 20230309. Don’t worry (that this lovely streamline moderne building with chamfered corner, colourful cornice and strong horizonal lines has been demolished) be happy. Image March 11, 2023 Vik
photos 20230308. After being dismantled, the building that was home to the Tom Jones Steak House is back with more windows. Image March 11, 2023 Vik
photos 20230228. What a cornice at 363 Clinton Street / 688-690 Bloor Street West. Image March 1, 2023 Vik
photos 20230226. A fascinating chamfered corner on a modest art deco building. The abrupt change in material of the cornice and the vertical concrete element seem to suggest that there was once two signs (perhaps with neon lighting) over the doorway facing opposite directions. Image February 27, 2023 Vik
photos 20230217. This McDonald’s at Queen and Church can be rather sketchy at times but I would rather it stay than the 60 (sixty!) storey skyscraper coming. All facades but that of the McDonald’s building will be retained. Apart from that condo to the left all buildings are low-rise on this block. Image February 18, 2023 Vik
photos 20230210. Walking in the shadow of the sun. I am not really sure what that means but it seems appropriate. Image February 17, 2023 Vik
photos 20230209. I have a thing for parking garage entrances. This is the Prestige Condos at 28 Freeland Street. Image February 10, 2023 Vik
photos 20230207. What was left of the Campbells Soup Factory in 2021. Now or soon you can have an industrial suite at the Birmingham Industrial park – aptly named for the address of this factory at 60 Birmingham. Image February 8, 2023 Vik
photos 20230206. There goes the 1947 LCBO warehouse on Toronto’s waterfront. The booze supply now sits at the much larger Durham warehouse and LCBO has contracted Trillium Supply to handle their ecommerce. Image February 7, 2023 Vik
photos 20230205. With the Sugar Wharf Condos Phase 1 rising in the background (64, 70 storeys), the LCBO lands are being prepared for Sugar Wharf Phase 2 (64, 70 storeys) which will retain the bridge and facades. Image February 5, 2023 Vik
photos 20230204. When I was last at Union Station, passing between TTC and GO, the most salient features made me wonder why the bathrooms are so far away and confirm that I was indoors. Image February 5, 2023 Vik