photos 20230421. As Exhibition Station prepares to accommodate the Ontario Line, a temporary pedestrian bridge is being constructed while the current tunnel will be inaccessible. Image April 22, 2023 Vik
photos 20220506. The new rail bridge being constructed over Dupont St on the GO Transit Barrie Line is much higher allowing for a park underneath to the south. Image May 6, 2022 Vik
photos 20220315. As the GO grows. GO Expansion includes the Davenport Guideway and Greenway (a park under an elevated railway). Once past Wallace Ave, the guideway returns to ground. Image March 16, 2022 Vik
photos 20220314. As the GO grows. GO Expansion includes the Davenport Guideway and Greenway – a park created by an elevated railway crossing over the CP Rail tracks at the Davenport Diamond. Image March 14, 2022 Vik
photos 20211203. The Davenport Diamond Grade Separation project, allowing Barrie Line GO trains to pass over the CP Rail tracks, is progressing rapidly. Image December 3, 2021 Vik
photos 20210927. The new Kipling Bus Terminal is a transit hub serviced by GO Transit and MiWay. Image September 27, 2021 Vik
photos 20210917. The new Kipling Bus Terminal serviced by GO Transit and MiWay is a bit of a walk but it has great art. Image September 18, 2021 Vik
photos 20210906. The new Kipling Bus Terminal serviced by GO Transit and MiWay is a bit of a walk but it has great art. Image September 6, 2021 Vik
photos 20210722. Bridges of July #22. The pedestrian bridge over Finch Avenue from Old Cummer GO Station. Image July 23, 2021 Vik
photos 20210713. Bridges of July #13. The long sleeved pedestrian bridge over Highway 401 from Pickering GO station to the Pickering Town Centre. Image July 13, 2021 Vik
photos 20210704. Bridges of July 04. The blur of people passing under the Rouge River Bridge – soon to be replaced by a bigger bridge that can accommodate additional tracks. Image July 4, 2021 Vik
photos 20201216. Remembering the old GO Transit concourse at Union Station (1979) and one of its nicest design elements – the doors. Image December 17, 2020 Vik
photos 20201213. After 17 years of operation, the old $9 000 000 GO Bus Terminal at 141 Bay Street is being demolished. Image December 14, 2020 Vik
photos 20201207. The new Union Station bus terminal is now open but there isn’t much to see. It’s as bland as the new GO Train concourse and the boarding area is not visible to the public. Image December 8, 2020 Vik
photos 20201110. Looking east over the tip of Ordnance Triangle where the Union Station Rail Corridor splits. Image November 10, 2020 Vik
photos 20201030. The new King-Liberty Pedestrian Bridge (connecting King Street W and Liberty Village), complementing the Strachan Ave rail trench, is almost open. Image October 31, 2020 Vik
photos 20200903. High-rise living in Weston along the GO Transit Kitchener Line and the Union Pearson Express. Image September 7, 2020 Vik
photos 20200627. This old school pedestrian crossing at Oriole GO station will be removed for the realignment of the Highway 401 off-ramp to Leslie Street. June 28, 2020 Vik
photos 20200321. There is nobody at the Union Station GO Transit bus terminal. Saturday March 21, 2020 15:41. March 24, 2020 Vik
photos 20200318. The long and empty GO Transit corridor to platforms 24-27 Wednesday at 5:53 PM during Ontario’s coronavirus pandemic state of emergency. March 23, 2020 Vik
photos 20200317. GO Transit had barren platforms at rush hour on this day when Ontario declared a state of emergency. March 23, 2020 Vik