Tag Archives: gardiner expressway
20230602. Under the Gardiner.
20220909. As part of the Signalling and Train Contril improvement program for the Union Station Rail Corridor, this signal tower has been restored and obscured by a new south facing wall.
20211007. Just like that, the Gardiner Expressway east end ramps are gone!
20210916. That iconic view of the Gardiner Expressway is changing rapidly.
20210907. Lake Shore Blvd East and the Don Roadway looks much brighter now as demolition of the Gardiner Expressway east end ramps moves quickly.
20210901. Toronto Today #1. The Gardiner Expressway east end ramps are now closed permanently as the city prepares to demolish the section east of the Don Valley Parkway on-ramps.
20210710. Bridges of July #10. A sunbeam steals through spans of a box girder bridge under the Gardiner on the Humber River.
20210302. Traffic time lapse during a break in the rehabilitation of the Gardiner Expressway (Summer 2020).
20201209. With mobile gantry cranes parked and no girders to be seen, it seems that Phase 1 of the Gardiner Expressway Rehabilitation from Jarvis to Cherry Streets is just about done.
20200711. A sliver of sun sneaks through spans of this Gardiner Expressway box girder bridge.
20200620. Sun and shadow play on the Gardiner Expressway.
20200619. Removing a section of the Jarvis Street on-ramp.
20200617. A piece of old on-ramp sits above Jarvis Street waiting to be removed.
20200531. Dismantling the Jarvis Street on-ramp to the Gardiner Expressway.
20200526. Expressway bents frame 10 York and the parkade behind it.
20200524. Expressway bents frame this Ten York Condos facade.
20200523. Expressway bents frame this Scotiabank Arena facade.
20200516. The West Don Lands are starting to change as the Gardiner Expressway is rehabilitated – rail is being removed, brush has been cleared and old businesses are gone.
20200509. The next piece of the Gardiner Expressway to be transported into place waits overnight at the fabrication site in the West Don Lands.
20200507. Infrastructure framing infrastructure. Lake Shore Boulevard East by the Keating Channel.
20200502. Moving a prefabricated steel girder for the Gardiner’s rehabilitation involves 2 tractors, 2 motorized trailers and 90 wheels.