This year, the Yorkdale Shopping Centre is 50 years old.
You can see what this area looked like shortly after the demolition of the Yorkdale subway commuter parkade at https://www.flickr.com/photos/vikpahwa/12895379454/
Tag Archives: construction
20141022. The Sun Life Financial building at One York rises east of the 10 York Condo pit in Toronto.
20141007. Although the One York St tower in Toronto is under construction, you can take the PATH walkway through it now.
20141004. Into the mouth of the temporary bridge spanning the construction site of the future 100 Adelaide W, Toronto.
20141004. Into the mouth of the temporary bridge spanning the construction site of the future 100 Adelaide W, Toronto.
20140928. The temporary bridge to existing loading docks spans the construction site of the future 100 Adelaide West, Toronto.
20140822. Modernist high-rise demolition cross-section in Regent Park, Toronto.
We should applaud the revitilization in Regent Park but should also appreciate the design of these modernist towers before all five are gone.
They were very unique. John Bentley Mays did a good job describing these apartments: “Every one of the five high-rises is a stack of 97 one-, two- and three-bedroom apartments, each disposed, like a small townhouse, on two floors. By eliminating corridors on every second floor — the elevator skips the floors without hallways — Dickinson was able to open out the common area in each apartment to the width of the whole slab. The results: a sense of spaciousness, light coming from two directions, good cross-ventilation and views of Lake Ontario for almost every resident of the towers.”
20140801. The Canadarm of concrete pumping stands out Toronto’s Bay Adelaide East construction site.
20140128. Working in construction can be a balancing act at the future Queen Richmond Centre West in Toronto.
Photo 20131112. This 6-story-sized X marks the spot of the future Queen Richmond Centre West in Toronto.
For a rendering of the building, go to http://www.qrcwest.com/en_building.htm.