photos 20230205. With the Sugar Wharf Condos Phase 1 rising in the background (64, 70 storeys), the LCBO lands are being prepared for Sugar Wharf Phase 2 (64, 70 storeys) which will retain the bridge and facades. Image February 5, 2023 Vik
photos 20230204. When I was last at Union Station, passing between TTC and GO, the most salient features made me wonder why the bathrooms are so far away and confirm that I was indoors. Image February 5, 2023 Vik